Applying for a new electricity meter in the GEPCO area — the standard process and the documents to prepare.
Apply through GEPCO's online new-connection route or at your local GEPCO sub-division office, choosing your category (residential, commercial, industrial, agricultural).
GEPCO staff survey the premises and prepare the estimate / demand notice based on distance from the nearest pole and sanctioned load.
Pay the demand notice in the designated bank. Keep the stamped copy — work starts against it.
After payment and any required wiring/test report, GEPCO installs the meter and issues your reference number — the same 14-digit number you will use in the checker on this site.
Requirements can vary by category and load. Confirm the current list at your sub-division office or on helpline 118 before visiting.